Commit Graph
9 Commits
Author SHA1 Message Date
Matiq 627e8373e6 res_power breakthrough: 500Hz residual solved (q0.1 err +0.00), decomp inventory, FUN_180563440 decoded 2026-08-19 09:56:19 +03:00
Matiq 1a57c48318 runtime capture pt2: vst3 loads AT ImageBase 0x180000000; 0x540658 = field [ctx+0x540658] not RVA; beacon->ctx script (racy) 2026-08-18 21:11:29 +03:00
Matiq 41fc402b05 Handoff: multi-band combination measured - depth not split by count, sens=0 band contributes 0, band1+band2=+0.53dB over max (not product/additive) => displacement-sum+saturation; single-band B.12 off 1.4dB at 1778 2026-08-18 20:33:48 +03:00
Matiq bc46f039de Handoff: joint dual+al LUT refit fails (al rmse 0.89) - level-pickoff mechanism not statically recoverable; needs runtime mask/level capture 2026-08-18 20:27:53 +03:00
Matiq 6b1e690247 Handoff: RPP base64-XML parameter decoder; b1f_* are MULTI-band (poisoned for B.12); t1kq_only1_* true single-band; FFT-amp calibration; clean dataset = dual_b1q+al_ 2026-08-18 20:26:29 +03:00
Matiq ae380c93c8 Phase5/step5b: full frame-render pilot works (STFT+per-bin LUT mask+OLA); al_* level-sweep exposes steeper real LUT leg vs B.12 frozen knots; fc-scan premise conflict flagged 2026-08-18 19:43:26 +03:00
Matiq 3b8095cee7 Handoff: step4 partial - attack<=20ms measured on renders; 0x1ac=oversample{2,4,8,16}; coeff tables undecodable 2026-08-18 19:34:46 +03:00
Matiq 60bf3a2394 Phase5/step3 partial: FFT-conv loop mapped; freq-axis const offline; 0x540658 static-invisible 2026-08-18 18:34:52 +03:00
Matiq c8f97e4ea3 Phase5/step2: B.12 model live (rmse 0.236) + freq-axis builder correction (offline const) 2026-08-18 18:08:57 +03:00