Files
soothe2-re/dsp
Matiq 9ed22d3476 chain_9_19: enable IIR4×2 (double precision) + FIR min-phase. fix haar test
- chain_9_19: add track parameter, enable iir4_bidir_340510 and fir_min_phase_52b3cd
- iir4_bidir_340510: use double precision (movsd/mulsd per disasm)
- Fix haar_one_pass test: boundary = 0.5*(a[n-2]+a[n-1]) = 8.0 not 8.5
- All fn529fe0_check tests PASS
- Canon bridge 1.594 unchanged (chain gated by RT_CASC env)
2026-09-02 18:05:14 +03:00
..